Sizing information
Overall size (inc frame) | x cm ( x in) |
Depth | cm (in) |
Artwork | x cm ( x in) |
Border (mount) |
cm
top/bottom
(in)
cm left/right (in) |
The paper size of our wall art shipped from the US is sized to the nearest inch. |
Our prints
We use a 200gsm fine art paper and premium branded inks to create the perfect reproduction.
Our expertise and use of high-quality materials means that our print colours are independently verified to last between 100 and 200 years.
Read more about our fine art prints.
Manufactured in the UK, the US and the EU
All products are created to order in our print factories around the globe, and we are the trusted printing partner of many high profile and respected art galleries and museums.
We are proud to have produced over 1 million prints for hundreds of thousands of customers.
Delivery & returns
We print everything to order so delivery times may vary but all unframed prints are despatched within 1–3 days.
Delivery to the UK, EU & US is free when you spend £75. Otherwise, delivery to the UK costs £5 for an unframed print of any size.
We will happily replace your order if everything isn’t 100% perfect.
Product images of The inauguration of the Suez Canal
Product details The inauguration of the Suez Canal
The inauguration of the Suez Canal
The inauguration of the Suez Canal, 17 November 1869, (1900). Crowds watch the first ships to travel through the canal which was designed by French engineer Ferdinand de Lesseps. It was opened by the Empress Eugenie.
- Image ref: 1344653
- The Print Collector / Heritage-Images